Identify the installed system
Record the purifier model, revision and cartridge position. Send the supplier a reference cartridge and photos of the filter head. A photo of the cartridge alone can miss differences in the locking mechanism or the inlet and outlet layout.
Check the interfaces on the sample
Compare the locking tabs, port locations and sealing surfaces against the reference. Install and remove the sample in the actual filter head, following the purifier instructions. Confirm that it seats fully, locks as expected and can be removed without unusual force. Have the test team check for leaks under the system’s approved operating conditions.
Record fit and filtration separately
A fit check establishes whether the cartridge can be installed and sealed on the unit tested. If your packaging will make filtration claims, request the supporting test evidence for the exact cartridge and configuration. Keep the fit record, test evidence and approved label with the sample approval.
For a Qiteng OEM inquiry, share the purifier model, cartridge photos, estimated quantity and destination market. We can review which interfaces and samples need to be checked before a quotation or production approval.




